1. General Rules
The construction requirement and attention matters:
•Make sure the safety in high-altitude operations, there are at least 2 workers to install the machine. Worker who outside the window must fasten the seat belt, and other worker should protect the partner's safety. Without safety measures shall be strictly forbidden when install the machine at the exterior wall.
•It is forbidden to go barefoot during construction, especially the operator who work at the outer wall must wear rubber shoes or sneakers, slippers are forbidden.
•Must pay special attention to the fire safety: in the construction work site is strictly prohibited to smoke, when welding operation and sectcuting operation must ensure that no inflammable and explosive goods piled up operation scope, air cooler belong to flammable goods, must stay away from workplace before lifting the scene;
•The air cooler must put in ventilated and empty place, do not put near to the smelly, heat source and rest area, especially must far away from the fire.
2. Tools and spare parts for installation
3. Platform fixation
Use the string to fix the bracket, then put down the bracket in slowly, the worker should go down through the special ladder, to confirm the place to the bracket, then use the drilling machine to make hole, after put the sets screw, the other side is in the same, must make sure the bracket is put in same level. The worker should fasten the seat belt and make sure the fire safety.
4. Cooler Installation
After the bracket installation finish, put the air cooler equipment first. Use the string to fasten the air cooler, put down in slow, and the workers should fasten the seat belt, wear the slipper is forbidden. After the machine installation, please also clear the water tank of the air cooler, in case blocking in the future.
5. Air diffuser & Water System